Friday, April 26, 2024

HIP is coming ..... (2)

   
Timeline
16 Jan 2023 - Received letter confirming that the precinct has been selected for HIP
15 Jul 2023 - Mini-Exhibition & Preliminary Survey 
27-28 Oct 2023 - Polling days
16 Nov 2023 - Received notice that HIP for the precinct has been successfully polled
17 Nov 2023 - Received notice on the appointed contractor for the HIP
26 Nov 2023 - Selected the toilet's tiles, main entrance's door and grille gate, etc.
11 Dec 2023 - Contractor conducted condition survey within the flat
30 Mar 2024 - Received notice that the HIP will be carried out in one month's time
16 Apr 2024 - Received notice that the works have been scheduled from 30 Apr - 11 May

13 Apr - hooks were installed outside the flat

   
Started packing and sealing the furnitures with dust-proof plastic film. Those normal (off-white) masking tape that you can find at DIY store isn't strong enough to hold and it just peels off instantly. Better use the yellow washi (painter's) masking tape.

I've prepared quite a number of things:
  • 2 sets of Bidet Spray Set (spraye, stainless steel hose, T-adaptor 3-ways valve, sticker holder)
  • 10x Towel racks (40cm/70cm/80cm)
  • faucet leakproof Sealing Gasket (Silicone)
  • 2x self adhesive toilet paper holder
  • self adhesive hooks
  • 2x self adhesive wall mounted storage shelf
  • 2x self adhesive acrylic mirror (30cm x 30cm)
  • LED bathroom ceiling lights
  • 707 Conpact instant water heater
  • 4x mini ball valves
  • bib tap
Hope I'm not missing out anything essential.










Also bought this voice cancelling Soundcore Space One to help me to get through the drilling of the toilets while I'm working in my room.

No comments:

Post a Comment